• About Fingrid
    • Corporate responsibility
    • In brief
    • Corporate Governance
    • Careers
    • Finextra Oy
    • Datahub Oy
    • Research and development
    • Information for consumers
    • Glossary
    • Annual Report
  • Investors
    • The operating principles of finance
    • Financing
    • Credit ratings
    • Calendar
    • Financial reports and presentations
    • Shares and shareholders
    • Corporate governance
    • Investor relations mailing list
  • Contacts
    • Offices
    • Customer contacts
    • Media contact persons
    • Extranet service
    • Fault reports
    • Feedback
    • Billing addresses
  • EN
    • SV
    • FI
  • EN
  • SV
  • FI
  • News
    News
    Fingrid's publications
    • Fingrid's corporate magazine
    • Newsletter
    • Brochyres and guides
    • Annual Report
    • Order printed publications
    Fingrid magazine
    Events
    • Fingrid Current
  • Electricity market
    Electricity market services
    Power system
    • State of the Baltic Sea area power system
    • Operation disturbances
    Unified electricity market
    • The future of the electricity markets
    • Congestion income
    • Network codes
    • European co-operation
    Reserves and balancing power
    • Frequency containment reserves (FCR products)
    • Fast Frequency Reserve (FFR)
    • Automatic frequency restoration reserve (aFRR)
    • Balancing energy and balancing capacity markets (mFRR)
    • Reserve Trading and Information Exchange
    • Reserve power plants
    Datahub
    • Information Exchange Services
    • Sign in to Datahub Customer Portal
    Balance services
    • Description of balance model
    • Imbalance settlement
    • Fees
    Guarantees of Origin
    • Joining the electricity GO register
    • Transactions of electricity GOs
    • Fees
    • Legislation
    • Frequently asked questions
    • Material and market information
  • Grid
    Main grid services
    Connection to the main grid
    • Examine grid connections on a map
    • New connection and change in connection
    • General connection terms
    • Connection agreement and grid connection fees
    • Main grid contract and service fees
    • Grid code specifications
    • Archive
    Network design
    Electricity transmission and the use of the electricity system
    • Electricity system of Finland
    • Power transmission grid of Fingrid
    • Main electiricity transmission lines
    • Nordic power system and interconnections with other systems
    • Power system management
    • Maintenance of power balance
    • Maintaining system security
    • Supply security of electricity
    • Transmission management
    Construction
    • The progress of the project
    • The Helsinki 400 kilovolt power cable connection
    • Aurora Line
    Maintenance
    • Transmission lines
    • Substations
    Safety
    • Occupational safety
    • Impacts of transmission lines on people
    • Safety instructions
    • Frequently asked questions
    Peak load capacity
    • Fees
    • Yearly periods
    Land use and environment
    • Land use and environmental policy
    • Principles and operating methods
    • Mitigating environmental impacts
    • Using transmission line rights-of-way
    • Permits and statements
    Information regarding electricity shortages
    • Questions and answers about electricity shortages
  • Open data
    Load and generation
    Imbalance
    • Price of imbalance power until 1.11.2021 01.00
    • Imbalance power between Finland and Sweden
    • Imbalance price from 1.11.2021
    GO Data
    • Transactions of electricity GOs as monthly totals (MWh)
    • Transactions of electricity GOs by production type (MWh)
    • Account holders
    • Production devices
    Load and generation forecasts
    • Generation hourly forecast
    • Load hourly forecast
    Inertia of the Nordic power system
    Cross-border transmission
    • Mid-term capacity development
    Wind power generation
    Available capacities
    Solar power
    Real-time CO2 emissions estimate
    Reserve market information
    • Automatic Frequency Restoration Reserve (aFRR), realised hourly transactions
    • Frequency containment reserves (FCR-N, FCR-D up and FCR-D down), transactions in the hourly and yearly markets
    • Activated reserve
    • Special regulation
    • Fast Frequency Reserve
    • Volume and price of balancing energy
    • Aggregated regulating bids
    • Balancing Capacity Market, estimate of required procurement
    History data from cut P1
    European transparency platform
  • Home /
  • News /
  • Fingrid's publications /
  • Fingrid's corporate magazine
  • Fingrid's corporate magazine
    • Safety on the lines - publication for service providers
  • Newsletter
  • Brochyres and guides
  • Annual Report
  • Order printed publications

Fingrid's corporate magazine

Fingrid's corporate magazine is published three times per year both in Finnish and in English.

Order printed magazine >

Fingrid Magazine is published also online.

Older magazines:

Archive 2022

 

 

            FG_Lehti_1_22.JPG

        Fingrid Magazine 1/2022

         As.lehti2_2022_kansi.JPG

   Fingrid Magazine 2/2022

        As.lehti32022kansi.JPG

  Fingrid Magazine 3/2022

 

Archive 2021

 

         Fingrid_lehti3_2021_kansi.JPG

   Fingrid Magazine 3/2021

         Fingrid_lehti2_2021_kansi.JPG

    Fingrid Magazine 2/2021

          

        Fingrid Magazine 1/2021

 

Archive 2020

   

 

1/2020

 

As.lehti2_2020eng_kansi.JPG

2/2020

FG_Lehti3_2020.JPG

3/2020

 

 

 

 

 

 

Archive 2017-2019

3/2019

2/2019

1/2019

 

3/2018

 

2/2018

 

1/2018

3/2017

2/2017

1/2017

 

 

Archive 2004-2007

1/2007

2/2007

3/2007

1/2006

2/2006

3/2006

1/2005

2/2005

3/2005

1/2004

2/2004

3/2004

Links

  • Fingrid Magazine online

Phone all locations: +358 30 395 5000
 
All contacts
LOCATIONS
Helsinki Hämeenlinna Jyväskylä Vaasa Varkaus Oulu Rovaniemi
WEBSITE
Legal terms
Cookies
Privacy statement
Give feedback
STAY UP TO DATE
Order Newsletter and  Fingrid Magazine.
Order materials