Page 1 Created with Sketch. Page 1 Created with Sketch. Page 1 Created with Sketch. Page 1 Created with Sketch. Artboard 1 copy 14Artboard 1 copy 7Artboard 1 copy 66Artboard 1 copy 23Artboard 1 copy 16Artboard 1 copy 55Artboard 1 copy 43Artboard 1 copy 50Artboard 1 copy 54Artboard 1 copy 34Artboard 1 copy 51Artboard 1 copy 36Artboard 1 copy 35Artboard 1 copy 46Artboard 1 copyArtboard 1 copy 31Artboard 1 copy 48Artboard 1 copy 9Artboard 1 copy 27Artboard 1 copy 8Artboard 1 copy 20Artboard 1 copy 2Artboard 1 copy 24Artboard 1 copy 62Artboard 1 copy 30Artboard 1 copy 41Artboard 1 copy 28Artboard 1 copy 26Artboard 1 copy 67Artboard 1 copy 52Artboard 1 copy 33Artboard 1 copy 29Artboard 1 copy 19Artboard 1 copy 53Artboard 1 copy 22Artboard 1 copy 21Artboard 1 copy 12Artboard 1 copy 13Artboard 1 copy 47Artboard 1 copy 49Artboard 1 copy 57Artboard 1 copy 32Artboard 1 copy 4Artboard 1 copy 25Artboard 1 copy 10Artboard 1 copy 15Artboard 1Artboard 1 copy 56Artboard 1 copy 11Artboard 1 copy 38Artboard 1 copy 65Artboard 1 copy 39Artboard 1 copy 5Artboard 1 copy 58Artboard 1 copy 6Artboard 1 copy 17Artboard 1 copy 40Artboard 1 copy 60Artboard 1 copy 3Artboard 1 copy 45Artboard 1 copy 18Artboard 1 copy 42Artboard 1 copy 61Artboard 1 copy 63Artboard 1 copy 64Artboard 1 copy 59Artboard 1 copy 44Artboard 1 copy 37 Combined Shape Created with Sketch. icon/info Created with Sketch. icon/info Created with Sketch. Group 17 Created with Sketch. Fill 1 Created with Sketch. Page 1 Created with Sketch. 99021DFE-DB58-4EE2-9D52-C2BF154A8B0A Created with sketchtool. Oval 2 Created with Sketch. Combined Shape Created with Sketch. Combined Shape Copy Created with Sketch. Group 18 Created with Sketch. Group 16 Created with Sketch. Page 1 Created with Sketch. ; ;

aFRR, automatic Frequency Restoration Reserve

The purpose of the automatic Frequency Restoration Reserve (aFRR) is to maintain the power balance between production and consumption and to restore the frequency to its nominal value of 50.0 Hz. aFRR is a centralized, automatically activated reserve. Its activation is based on the frequency deviation in the Nordic synchronous area and activation is done via a power change signal sent by the transmission system operator.

The minimum regulation size is 1 MW, and the full activation time is a maximum of 5 minutes. More detailed information on the technical requirements can be found in the attached document “Technical requirements and prequalification process of aFRR” (see attachment 2 of reserve agreement).

Finland is part of the Nordic frequency area and participates in the maintenance of the Nordic aFRR. Fingrid is assigned to procure a proportional share of the Nordic aFRR capacity.

Fingrid ensures the procurement of the aFRR reserve from the Nordic aFRR capacity markets. Reserve providers can submit bids to the hourly capacity markets separately for upward and downward regulation capacity and receive a capacity payment for maintaining the capacity, which is determined by the highest accepted bid according to marginal pricing.

The aFRR activation is carried out using the activation signal allocated to Fingrid by the Nordic aFRR controller and through the aFRR energy market maintained by Fingrid. The activated aFRR energy resulting from the approved bids on the energy market is settled during the balance settlement process with the balance responsible party of the unit, and is compensated to the Balancing Service Provider (BSP) at the marginal price of the market time unit.

aFRR procurement in 2025

June 2025

May 2025

April 2025

March 2025

February 2025

January 2025

aFRR procurement in 2024

December 2024

November 2024

October 2024

Weeks 27-39

Weeks 14-26

Weeks 1-13

aFRR procurement in 2019-2023

2023

Weeks 40-52

Weeks 27-39

Weeks 14-26

Weeks 1-13

2022

Weeks 40-52

Weeks 27-39

Weeks 14-26

Weeks 1-13

2021

Weeks 40-52

Weeks 27-39

Weeks 14-26

Weeks 1-13

2020

Weeks 40-53

Weeks 27-39

Weeks 14-26

Weeks 2-13

2019

Weeks 40-52

Weeks 27-39

Weeks 14-26

Weeks 1-13

 

The aFRR market agreements are consistent in terms and content and are publicly available.

Data on the aFRR reserve market can be found on the Reserve Market Information page and on the Fingrid Open Data service.