aFRR, automatic Frequency Restoration Reserve
The purpose of the automatic Frequency Restoration Reserve (aFRR) is to maintain the power balance between production and consumption and to restore the frequency to its nominal value of 50.0 Hz. aFRR is a centralized, automatically activated reserve. Its activation is based on the frequency deviation in the Nordic synchronous area and activation is done via a power change signal sent by the transmission system operator.
The minimum regulation size is 1 MW, and the full activation time is a maximum of 5 minutes. More detailed information on the technical requirements can be found in the attached document “Technical requirements and prequalification process of aFRR” (see attachment 2 of reserve agreement).
Finland is part of the Nordic frequency area and participates in the maintenance of the Nordic aFRR. Fingrid is assigned to procure a proportional share of the Nordic aFRR capacity.
Fingrid ensures the procurement of the aFRR reserve from the Nordic aFRR capacity markets. Reserve providers can submit bids to the hourly capacity markets separately for upward and downward regulation capacity and receive a capacity payment for maintaining the capacity, which is determined by the highest accepted bid according to marginal pricing.
The aFRR activation is carried out using the activation signal allocated to Fingrid by the Nordic aFRR controller and through the aFRR energy market maintained by Fingrid. The activated aFRR energy resulting from the approved bids on the energy market is settled during the balance settlement process with the balance responsible party of the unit, and is compensated to the Balancing Service Provider (BSP) at the marginal price of the market time unit.
aFRR procurement in 2025
aFRR procurement in 2024
aFRR procurement in 2019-2023
2023
2022
2021
2020
2019
The aFRR market agreements are consistent in terms and content and are publicly available.
Data on the aFRR reserve market can be found on the Reserve Market Information page and on the Fingrid Open Data service.
Details
Tuomas Mattila
Expert
tel. +358 30 395 4180
Joonas Muikku
Specialist
tel. +358 30 395 4324
Vincent Eurasto
Specialist
+358303955387
Attachments
See also
- Notification of agreed reserve use of a resource
- Market Handbook - Nordic aFRR capacity market
- Guideline for variable production and consumption in automatic reserves
- Independent Aggregation compensation model calculation method, valid from 5.6.2025
- Attachment 1 Terms and conditions for providers of automatic Frequency Restoration Reserves (aFRR), valid from 5.6.2025
- Attachment 2 Technical requirements and prequalification process of aFRR, valid from 5.6.2025