Cross-border transmission capacities - Central Sweden

1.11.2011 Sweden will be divided into 4 bidding areas. Bidding area SE1 is connected to Finnish network through Northern AC lines and SE3 is connected through Fenno-Skan DC-cables.

History data from Sweden until 31st of October 2011 can be found here.

Show in format:   Graph   Table

  Loading

Frequency h day week month

Period of time:
Week
Month
Year
End
Beginning

Download in format:

Excel XML


Commercial flow

Chosen period
Min: 0 MWh/h
Max: 0 MWh/h
Average: 0 MWh/h

Measured flow

Chosen period
Min: 0 MWh/h
Max: 0 MWh/h
Average: 0 MWh/h

Lines in graph:

Commercial flow (MWh/h)

Measured flow (MWh/h)

Planned Elspot-capacity (MW)

Elspot-capacity (MW)